HFDS Forum

HFDS Forum (http://hfds.org/vbull/index.php)
-   Mozola Memorial Course (http://hfds.org/vbull/forumdisplay.php?f=7)
-   -   Buffalo Bayou Project (http://hfds.org/vbull/showthread.php?t=1090)

Sasquatcharoo 12-19-2011 03:27 PM

Buffalo Bayou Project
 
Does anyone know how this will affect the Mozola course?

The renderings are pretty off considering there's a bunch of land between the skate park and Sabine.

http://www.chron.com/mediaManager/?c...628&height=471

derek 12-19-2011 03:30 PM

Re: Buffalo Bayou Project
 
Yes. Expansion to 21 holes on both sides of the bayou in the works. We will be playing a preview of my design for the Heart of Houston Open Jan. 7th

Quote:

Originally Posted by Sasquatcharoo (Post 22876)
Does anyone know how this will affect the Mozola course?

The renderings are pretty off considering there's a bunch of land between the skate park and Sabine.


JimG520 05-22-2012 09:20 AM

Re: Buffalo Bayou Project
 
So there's a new dirt road/path that crosses 8's fairway (and the bike path) and goes along the bayou all the way up to 9's basket. I'm assuming that path is temporary, but does anyone know the purpose? Are they going to be building something by 9's basket? Will that hole need to change?

derek 05-22-2012 01:33 PM

Re: Buffalo Bayou Project
 
Quote:

Originally Posted by JimG520 (Post 23831)
So there's a new dirt road/path that crosses 8's fairway (and the bike path) and goes along the bayou all the way up to 9's basket. I'm assuming that path is temporary, but does anyone know the purpose? Are they going to be building something by 9's basket? Will that hole need to change?

For removing sediment, they are going to try and keep up with removal after each flood event. You can see them doing this on the Tinsley side as well. I was told 9 does not need to change


All times are GMT -5. The time now is 09:23 PM.

Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.