
12-19-2011, 11:05 AM
|
|
Par
Current HFDS Member
|
|
Join Date: May 2010
Location: Houston
Posts: 74
|
|
Re: Parking lot construction
Precinct 3 contines work on the turning lane and entrance ramp at Texas Army Trail.
http://www.youtube.com/watch?v=VUlAZIwgbic
The ramp may be open as early as 12/22/2011, but the curbs will not be done. All the work should be completed by 1/1/2012, and then the parking lot will be open.
The practice basket is installed where the Tee box #1 used to be. The Tee box was moved about 40 feet west.
|