View Single Post
  #6  
Old 12-19-2011, 11:05 AM
freddie freddie is offline
Par
Current HFDS Member
 
Join Date: May 2010
Location: Houston
Posts: 74
Default Re: Parking lot construction

Precinct 3 contines work on the turning lane and entrance ramp at Texas Army Trail.

http://www.youtube.com/watch?v=VUlAZIwgbic

The ramp may be open as early as 12/22/2011, but the curbs will not be done. All the work should be completed by 1/1/2012, and then the parking lot will be open.

The practice basket is installed where the Tee box #1 used to be. The Tee box was moved about 40 feet west.
Reply With Quote