Default Parking lot construction

Precinct 3 is busy building the parking lot for Texas Army Trail DGC.

http://www.youtube.com/watch?v=ZlsiRjIp1oU

The piles of dirt on the west side of the detention pond will be moved to low spots on holes 6, 7, and 8. The county thinks they will be finished with the gravel this week. They will have the parking lot asphalted next week, and then stripped the following week. The county has not set a schedule for tee pads or the new entrance ramp and turning lane.

Thank you Precinct 3!
Reply With Quote
  #2  
Old 10-31-2011, 01:44 PM
freddie freddie is offline
Par
Current HFDS Member
 
Join Date: May 2010
Location: Houston
Posts: 74
Default Re: Parking lot construction

Precinct 3 has finished the work on the parking lot.

http://www.youtube.com/watch?v=Gn5ctToXWsQ

48 parking spots + 2 handicap spots.

There is no access to the parking lot as Precinct 3 is building a new access ramp. Please continue to park across the street.
Reply With Quote
  #3  
Old 11-01-2011, 07:31 AM
Smokin' Joe's Avatar
Smokin' Joe Smokin' Joe is offline
Double Eagle
 
Join Date: Jul 2008
Posts: 858
Default Re: Parking lot construction

Looks good!
Reply With Quote
  #4  
Old 11-15-2011, 06:58 PM
nomad nomad is offline
Par
 
Join Date: Jul 2008
Location: 77007
Posts: 40
Default Re: Parking lot construction

so....when can i hit this course up on a weekday?
Reply With Quote
  #5  
Old 11-16-2011, 08:14 AM
freddie freddie is offline
Par
Current HFDS Member
 
Join Date: May 2010
Location: Houston
Posts: 74
Default Re: Parking lot construction

Quote:
Originally Posted by nomad View Post
so....when can i hit this course up on a weekday?
Precinct 3 has not set a date when the park will open. This week they started work on the turning lane and access ramp. A worker told Chuck that that work will take about 3-4 weeks. After the turning lane and access ramp are complete, we'll see what the county is planning next.

Patience people .... Patience
Reply With Quote
  #6  
Old 12-19-2011, 11:05 AM
freddie freddie is offline
Par
Current HFDS Member
 
Join Date: May 2010
Location: Houston
Posts: 74
Default Re: Parking lot construction

Precinct 3 contines work on the turning lane and entrance ramp at Texas Army Trail.

http://www.youtube.com/watch?v=VUlAZIwgbic

The ramp may be open as early as 12/22/2011, but the curbs will not be done. All the work should be completed by 1/1/2012, and then the parking lot will be open.

The practice basket is installed where the Tee box #1 used to be. The Tee box was moved about 40 feet west.
Reply With Quote
  #7  
Old 12-31-2011, 08:20 AM
freddie freddie is offline
Par
Current HFDS Member
 
Join Date: May 2010
Location: Houston
Posts: 74
Default The parking lot is open!

The parking lot at Texas Army Trail is open. I'm not sure the construction work is completed; however, they have left the new ramp unblocked.

There are 48 parking spots. Plenty for everyone.
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:49 AM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.