If you are a new user looking to register, send an e-mail to uceng95-hfdsreg AT yahoo.com and we'll get you set up. In that e-mail be sure to include your first and last real name, desired user screen name (this will be your login ID as well) and your PDGA number, if you have one.

Go Back   HFDS Forum > Courses - HFDS League Affiliated > Mozola Memorial Course

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 12-19-2011, 03:27 PM
Sasquatcharoo Sasquatcharoo is offline
Bogey
 
Join Date: Apr 2010
Posts: 19
Default Buffalo Bayou Project

Does anyone know how this will affect the Mozola course?

The renderings are pretty off considering there's a bunch of land between the skate park and Sabine.

Reply With Quote
  #2  
Old 12-19-2011, 03:30 PM
derek derek is offline
*Ace*
Current HFDS Member
 
Join Date: Jul 2008
Location: houston
Posts: 1,052
Default Re: Buffalo Bayou Project

Yes. Expansion to 21 holes on both sides of the bayou in the works. We will be playing a preview of my design for the Heart of Houston Open Jan. 7th

Quote:
Originally Posted by Sasquatcharoo View Post
Does anyone know how this will affect the Mozola course?

The renderings are pretty off considering there's a bunch of land between the skate park and Sabine.
Reply With Quote
  #3  
Old 05-22-2012, 09:20 AM
JimG520 JimG520 is offline
Birdie
 
Join Date: Nov 2010
Location: Meadows Place
Posts: 201
Default Re: Buffalo Bayou Project

So there's a new dirt road/path that crosses 8's fairway (and the bike path) and goes along the bayou all the way up to 9's basket. I'm assuming that path is temporary, but does anyone know the purpose? Are they going to be building something by 9's basket? Will that hole need to change?

Last edited by JimG520; 05-22-2012 at 10:13 AM.
Reply With Quote
  #4  
Old 05-22-2012, 01:33 PM
derek derek is offline
*Ace*
Current HFDS Member
 
Join Date: Jul 2008
Location: houston
Posts: 1,052
Default Re: Buffalo Bayou Project

Quote:
Originally Posted by JimG520 View Post
So there's a new dirt road/path that crosses 8's fairway (and the bike path) and goes along the bayou all the way up to 9's basket. I'm assuming that path is temporary, but does anyone know the purpose? Are they going to be building something by 9's basket? Will that hole need to change?
For removing sediment, they are going to try and keep up with removal after each flood event. You can see them doing this on the Tinsley side as well. I was told 9 does not need to change
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:38 AM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.